Skip to main content
Logo print

Case studies | Legrand United Kingdom

Filter by:
Offices
RAPID, DALI and standalone presence detectors in Daily Express Building
08/12/2020

The iconic Daily Express Building originally built in 1939, in Great Ancoats Street, Manchester received a recent refurbishment. The restoration of the Grade II* listed facility has resulted in the building now offering 77,500 sq. ft. of contemporary workspace.

Offices
RAPID system provides flexible control for London School of Economics
11/09/2020

The Centre Building is a new state of the art, flexible and highly sustainable academic and teaching building in the London School of Economics and Political Science (LSE) complex. The brief was to provide accurate and easy adjustment of light levels, something vital for today’s places of learning, particularly the lecture areas which must cater for both traditional teaching and technical presentations.