Skip to main content
Logo print

RAPID system provides flexible control for London School of Economics | Legrand United Kingdom

 

 

RAPID system provides flexible control for London School of Economics

The Centre Building is a new state of the art, flexible and highly sustainable academic and teaching building in the London School of Economics and Political Science (LSE) complex. The brief was to provide accurate and easy adjustment of light levels, something vital for today’s places of learning, particularly the lecture areas which must cater for both traditional teaching and technical presentations.

CP Electronics products are already in use across multiple buildings around the LSE campus, with products that meet the requirements of flexibility and ease of use.

London school of economics CP Electronics

 London, United Kingdom - September 2020

The Centre Building is a new state of the art, flexible and highly sustainable academic and teaching building in the London School of Economics and Political Science (LSE) complex. The brief was to provide accurate and easy adjustment of light levels, something vital for today’s places of learning, particularly the lecture areas which must cater for both traditional teaching and technical presentations.

Our insight

LSE has created this new landmark building and Public Square at the heart of its campus on Houghton Street which will become a world-class home for the political sciences. The design has been zoned vertically, with the most public and highly-serviced facilities located on the lower levels which helps to animate the newly-created LSE Square and Houghton Street.  


The more private academic departments,- to which access is controlled, are located on the upper levels. The Centre Building also houses meeting rooms, a 200 seater flat auditorium which can be used for both lectures and events, and an LSE style lecture theatre that allows traditional style teaching as well as collaborative group work and a ground floor café. 

Our solutions

To control the lighting in the buildings’ multiple-use spaces, from lecture theatres to individual offices, CP Electronics provided the company’s RAPID System with a control strategy that includes daylight linking, presence detection and timers. CP Electronics’ RAPID System was specified for the project to control all of the lighting throughout the building, including a hardwired 3 x network area controller with Ethernet, 64 addressable hardwired DALI gateway modules, scene modules, a DALI network ceiling PIR and a RAPID computer graphics package. The DALI gateways and Area Controllers were built into panels offsite, to allow for future expansion when required.

The result

The Centre Building offers purpose-built spaces and facilities that will support and inspire the people who work within it and their ideas to transform the world through social-science research and education. CP Electronics products are already in use across multiple buildings around the LSE campus, with products that meet the requirements of flexibility and ease of use.