Skip to main content
Logo print

Premature collapse and fire rated containment | Legrand United Kingdom

Premature collapse and fire rated containment


CPD - Premature collapse and fire rated containment

Cost: Free
Ideal for: Architects · Designers · Product specifiers,  Facilities Managers, Electrical consulting engineers, Electrical contractors, Clients, Students
Course Duration: 1 hour (to include Q&A sessions
Location: Seminars can be carried out at our Wembley office, virtually via MS Teams, or at your own office.
Contact us: Email UK Training

Seminar overview Seminar content

With the safety of buildings becoming a key priority for all those involved in the construction industry driven by the recent Building Safety Act 2022, requirements for proven competency as described in documents such as BSI Flex 8670 and PAS 8671 - 3 along with the need for relevant, accurate and accessible fire safety information as required by BS8644-1:2022, the demand for evidential cable management fire testing has grown. This CPD explores the current UK standards landscape that applies to Cable Management Systems which don't currently require any fire testing, and offers an alternative standard as a solution to those looking for reassurance that their installations meet the requirements of both BS7671:2019 and BS8519:2020

1.      Critical Stages - Prevention

2.      Construction Products Regulation

3.      Circuit integrity cable – BS8519

4.      Wiring Regulations – BS 7671

5.      Building Safety Act / BS 8644 / Digital record

6.      Growing demand

7.      The future

8.      Summary

9.      Further learning

10.      Q&A